Sprint Calendar — S1 through S26¶
Two-week sprints are the operational unit of this campaign. Each one has a start date, an end date, a primary phase, a specific deliverable, an honest learning load (in hours), and a lab-notebook expectation. The calendar below is a contract with yourself — the moment you start negotiating with it, the plan starts eroding.
Four of the 26 sprints are buffer sprints (one per quarter). They exist to absorb slippage, weddings, festivals, heat, and life. If a quarter runs clean, the buffer becomes a teaching sprint — write, publish, teach. Do not use it to start a new project.
The convention:
Learning load is personal-time hours (evenings + weekends), not including your Zoho day job.
Lab-notebook expectation is the minimum entries.
S-plan= 1 planning entry at start.S-retro= 1 retro entry at end.Predict/Measure= at least one predict-then-measure entry inside the sprint (from../13_discipline/02_lab_notebook.md).
The Sprint Table¶
Sprint |
Weeks / Dates |
Phase |
Deliverable |
Load (hrs) |
Lab-notebook |
|---|---|---|---|---|---|
S1 |
Jul 6 – Jul 19, 2026 |
Env locked; programs 1–12 committed |
24–30 |
S-plan, S-retro |
|
S2 |
Jul 20 – Aug 2, 2026 |
Programs 13–25; collections notes |
24–30 |
S-plan, S-retro, Predict/Measure |
|
S3 |
Aug 3 – Aug 16, 2026 |
Programs 26–40; Phase 01 exit check |
24–30 |
S-plan, S-retro |
|
S4 |
Aug 17 – Aug 30, 2026 |
Rung 1 shipped (50 programs repo + Hashnode post) |
24–30 |
S-plan, S-retro, Predict/Measure |
|
S5 |
Aug 31 – Sep 13, 2026 |
30 DSA solutions (arrays, strings) + |
24–30 |
S-plan, S-retro |
|
S6 |
Sep 14 – Sep 27, 2026 |
30 more solutions; |
24–30 |
S-plan, S-retro, Predict/Measure |
|
S7 |
Sep 28 – Oct 11, 2026 |
Trees + graphs solutions (25–30); |
24–30 |
S-plan, S-retro |
|
S8 |
Oct 12 – Oct 25, 2026 |
Rung 2 shipped (150 DSA solutions, pattern-tagged) |
24–30 |
S-plan, S-retro |
|
— |
Oct 26 – Nov 1, 2026 |
Q1 Buffer Week |
Catch-up OR: write a Rung 2 blog + Phase 02 recap post |
5–10 |
Q1 review entry |
S9 |
Nov 2 – Nov 15, 2026 |
Phase 03 files 01–02 read; refactor-catalog repo scaffolded |
20–26 |
S-plan, S-retro |
|
S10 |
Nov 16 – Nov 29, 2026 |
Phase 03 files 03–04 read; smelly ORDER PROCESSOR refactor v1 |
18–24 |
S-plan, S-retro |
|
S11 |
Nov 30 – Dec 13, 2026 |
Refactor v2 + before/after diff; blog outline |
20–26 |
S-plan, S-retro, Predict/Measure |
|
S12 |
Dec 14 – Dec 27, 2026 |
Rung 4 shipped (repo + Hashnode blog) |
20–26 |
S-plan, S-retro |
|
S13 |
Dec 28 – Jan 10, 2027 |
Phase 04 files 01–02 read; |
20–26 |
S-plan, S-retro |
|
S14 |
Jan 11 – Jan 24, 2027 |
Phase 04 files 03–05 read; |
20–26 |
S-plan, S-retro, Predict/Measure |
|
— |
Jan 25 – Jan 31, 2027 |
Q2 Buffer Week |
Absorb wedding-season slippage; preload Phase 05 |
5–10 |
Q2 review + halfway retro (Hashnode post) |
S15 |
Feb 1 – Feb 14, 2027 |
Phase 05 files 01–03 read; rate limiter v1 |
26–32 |
S-plan, S-retro |
|
S16 |
Feb 15 – Feb 28, 2027 |
🚨 Rung 5 HARD GATE shipped (rate limiter + virtual threads) |
26–32 |
S-plan, S-retro, Predict/Measure |
|
S17 |
Mar 1 – Mar 14, 2027 |
Phase 06 files 01–03 read; Async Profiler flame graphs of Rung 5 |
24–30 |
S-plan, S-retro |
|
S18 |
Mar 15 – Mar 28, 2027 |
Rung 6 shipped (JVM case study with ≥1 reverted optimization) |
24–30 |
S-plan, S-retro, Predict/Measure |
|
S19 |
Mar 29 – Apr 11, 2027 |
Phase 07 files 01–02 read; URL Shortener scaffolded |
22–28 |
S-plan, S-retro |
|
S20 |
Apr 12 – Apr 25, 2027 |
Phase 07 files 03–04 read; JPA + Testcontainers wired |
22–28 |
S-plan, S-retro |
|
— |
Apr 26 – May 2, 2027 |
Q3 Buffer Week |
Absorb Chennai-heat energy loss; prep Rung 7 |
5–10 |
Q3 review entry |
S21 |
May 3 – May 16, 2027 |
Phase 07 files 05–07 read; Rung 7 auth + observability |
22–28 |
S-plan, S-retro |
|
S22 |
May 17 – May 30, 2027 |
Rung 7 shipped (URL Shortener production-ready) |
22–28 |
S-plan, S-retro, Predict/Measure |
|
S23 |
May 31 – Jun 13, 2027 |
Phase 08 files 01–03 read; ONNX Runtime Java hello-world |
22–28 |
S-plan, S-retro |
|
S24 |
Jun 14 – Jun 27, 2027 |
Phase 08 files 04–05 read; Rung 8 v1 (model serving endpoint) |
22–28 |
S-plan, S-retro, Predict/Measure |
|
S25 |
Jun 28 – Jul 11, 2027 |
Phase 08 files 06–07 read; Rung 8 on Kubernetes (k3d/minikube) |
22–28 |
S-plan, S-retro |
|
S26 |
Jul 12 – Jul 25, 2027 |
🚨 Rung 8 HARD GATE shipped (ML capstone on K8s) |
26–32 |
S-plan, S-retro, Predict/Measure |
|
— |
Jul 26 – Aug 1, 2027 |
Q4 Buffer Week |
Rest. Portfolio landing page live. Final Hashnode retro post. |
5–10 |
Final review entry + M13 pitch rehearsals |
Total: 26 sprints (of which 22 execute, 4 buffer). Roughly 560–720 personal-time hours across 13 months.
Sprint Load Budget¶
The load column is honest, not optimistic. Notice:
S9–S14 dip to 18–26 hrs — this covers the wedding-season months (Nov 2026 – Feb 2027, M5–M7). You will lose weekends. Plan for it.
S15–S16 climb to 26–32 hrs — the hard-gate sprint. If you cannot get to 26 real hours in these two sprints, use Q2 buffer week preemptively to preload Phase 05 reading in January.
S26 climbs to 26–32 hrs — capstone finish. Same principle: use Q3 or Q4 buffer proactively if June looks light.
If you consistently miss 20-hour weeks, you are not lazy — the plan is oversized for your current life, and you should compress rungs (drop MiniLinkedList, drop the stretch goals) rather than skip the sprint retros.
Slippage Log Template¶
Copy this into ../13_discipline/02_lab_notebook.md or a dedicated SLIPPAGE.md in your notes repo. Fill it out the day the slippage happens, not later.
### Slippage Log Entry
- **Sprint:** S__
- **Date logged:** YYYY-MM-DD
- **Planned deliverable:** ___
- **Actual state:** ___ (% done)
- **Root cause (one of):** work / family / health / scope-underestimate / motivation / other: ___
- **Buffer week available this quarter?** yes / no / already spent
- **Decision (choose one):**
- [ ] Absorb into buffer week (write plan for buffer week here)
- [ ] Cut scope (specify what drops)
- [ ] Slide deliverable one sprint (specify what shifts)
- [ ] Pause plan for 1 week (see 99_pre_mortem/08_fm_life_and_health.md)
- **Next-sprint impact:** ___
- **Learned:** ___
Two rules for the slippage log:
You are allowed to slip. You are not allowed to be quiet about it. A logged slip is data. An unlogged slip is a lie you’re telling yourself, and it will compound.
If you log 3 slips in a row without using a buffer week, stop and go read
../99_pre_mortem/09_summary_and_reset_protocol.md. That is the reset trigger.
What Not To Do With This Calendar¶
Do not front-load. The temptation in M1 is to blow through Phase 01 in three weeks and be “ahead.” What happens next: burnout by M4, plan feels stale by M6, quit by M8. The sprints are two weeks for a reason — the reason is your body and your job.
Do not skip retros. The S-retro is the smallest ritual with the largest compound return. Even 10 minutes at the end of a sprint writing “what shipped, what didn’t, what I learned” is worth more than the last hour of coding.
Do not renegotiate deliverables mid-sprint. If a sprint deliverable is wrong, note it in the retro and adjust the next sprint. Mid-sprint negotiation is how scope creep enters the plan — see
../99_pre_mortem/07_fm_scope_creep_and_shiny_objects.md.
Return to 00_command README · Previous: 01_month_by_month.md · Next: 03_north_star_artifacts.md